University of Essex

March 16, 2017

[Scheduled Alert] Power shutdown and testing at Southend Campus on Sunday 26 March 2017

Filed under: Network, Other, [Scheduled], [Service Alert] — Dan Jolly @ 11:48 am

Buildings across Southend Campus will be subject to a shutdown and power test on Sunday 26 March 2017. This scheduled maintenance work will affect access to some buildings, and some IT services may be unavailable.

IT Services staff will be on site and monitoring remotely to ensure services resume as expected. All buildings will resume usual opening hours on Monday 27 March.

Buildings and services affected:

The Forum

  • The Learning Hub (second floor) will be closed to all staff and students between 8am and 10am (you will be asked to leave at 7.45am)
  • The rest of the Forum including the Library will be closed for the whole day
  • The Learning Hub will be accessible through the out-of-hours side entrance before 8am and after 10am, but no other parts of The Forum will be accessible on that day.
  • Some IT services, for example wifi, may be unavailable between 1.30pm and 4.00pm

University Square

  • University Square will be powered down between 10am and 1pm
  • During this time lifts will be out of action, wired and wireless internet may be inaccessible and areas will be without power/lighting
  • The study facilities in The Forum’s Learning Hub will be accessible during this period

Gateway Building

  • Closed to all staff and students for the whole of Sunday 26 March

Clifftown Studios

  • Closed to all staff and students for the whole of Sunday 26 March

If you have any questions please contact IT Southend (it.southend@essex.ac.uk or extension 8341)

Leave a Reply

You must be logged in to post a comment.

The University of Essex will moderate comments and there will be a delay before any posts appear.